V. Alecsandri 4, District 1, Bucharest, RO

Existing urban concept

up to 28,000 sq.m of storage and light production facilities for SMEs

VIDEO PRESENTATION

New zoning concept

up to 30.000 SQM of hybrid cross-docking logistics and production facilities

VIDEO PRESENTATION

ABOUT THIS PROJECT


Smart City IUS is the project that will contribute significantly to reduce the delivery times of businesses
focused on last mile logistics/cross-docking as well as offering high quality production spaces.

WHERE YOU CAN FIND US

Located in Brașov next to MOB & IUS, Stabilus, UniParts Trucks, Jouanel Machine Tools, Madison Operational Brașov and Wopfinger.

Minutes away from A3 Highway Bucharest-Brașov, Brașov Ring Highway and Brașov International Airport.

OPPORTUNITY

Central location facilities access to Romanian airports, ports, railways and customs.

With immediate access to Brasov ring road through the future modernization of Narciselor street to 4 lanes, complete with an overpass and connection to the ring road.

The site facilities both urban distribution in Brașov but also to other cities sitting in the heart of the country approx. 4h-5h drive to main regional cities Cluj, Timișoara, Iași, Bucharest and Constanța.

PROJECT OVERVIEW


An overview of the project and the most representative figures that demonstrate its importance.

APPROX.

6 HA

OF DEVELOPMENT LAND

 

30.000 SQM

OF PREMIUM LOGISTICS AND PRODUCTION FACILITIES

 

264 CAR PARKING

SPACES

 

34 truck docks

AND parking spaces

TECHNICAL SPECS


Smart City IUS, the most important project of this kind in Brasov, now addresses to partners with premium logistics facilities:

01 HYBRID CROSS DOCKING CENTRE
05 LPR CAMERA SMART ACCESS
02 PRODUCTION FACILITY
06 GATE SECURITY
03 CAR PARKING
07 INCOMING DOCKS
04 TRUCK PARKING
08 Docuri / porți pentru ieșire
01 HYBRID CROSS DOCKING CENTRE
02 PRODUCTION FACILITY
03 CAR PARKING
04 TRUCK PARKING
05 LPR CAMERA SMART ACCESS
06 GATE SECURITY
07 INCOMING DOCKS
08 Docuri / porți pentru ieșire
Concrete structure, sandwich wall panels
Smart smoke vents
Automatic ventilation system
Gas fired heating system
Maximum column spacing 12m x 24m
Clear height maximum 12m
32m for exterior trucks maneuvering
Exterior maximum height 15m
Modern offices spaces
Docking height 1m
Loading docks (with dock levelers): 40
Floor loading 5t/sqm
Concrete structure, sandwich wall panels
Automatic ventilation system
Maximum column spacing 12m x 24m
32m for exterior trucks maneuvering
Modern offices spaces
Loading docks (with dock levelers): 40
Smart smoke vents
Gas fired heating system
Clear height maximum 12m
Exterior maximum height 15m
Docking height 1m
Floor loading 5t/sqm

Urban planning proposals


Solution 1

Solution 2

HIGH-TECH WORKFLOW


The Smart City IUS project has been designed in such a way as to make the least possible use of human interaction, which will automatically lead to lower costs for our partners, as well as increased work speed. To achieve all this, we used high tech technology.

01 Automatic number plate scan with LPR cameras
02 Automatic weigh-in station with CRM integration
03 Automated loading dock assignment
04 Cargo scanners inside of the loading docks for automated sorting

HIGH-TECH D.N.A WITH CROSS-DOCKING PLATFORM


LAST MILE
LOGISTICS
URBAN
WAREHOUSING
DEMAND FOR
NEW LOGISTICS
SIMPLIFYING
THE LAST MILE
INVESTING
IN SPEED
IUS PROJECT - SMART CITY
LOGISTICS & PRODUCTION